Investor
LG Energy Solution Wrocław SP. z O.O.
General contractor
SERVEONE POLAND / S&I POLAND SP. z O.O.

Description of the building

Buildings up to 26m high, consisting of several floors. The buildings consist of:

  • office part
  • production part
  • pure DRYROOM production part
  • the technical part

The scope of performed works

  • production, delivery, assembly of support structures for equipment piping and ventilation
  • condensate steam installation
  • installation of chilled water with connection of cooling towers
  • compressed air installation
  • nitrogen installation
  • construction of a new steam reduction station with the necessary fittings and automation
  • installation of mechanical ventilation
  • freon cooling installation of the VRF system
  • staircase aeration installation